作文首页初中作文寒假作文写人作文写景作文英语作文想象作文抒情作文议论文说明文单元作文科幻作文诗歌词赋写作素材 小学作文高中作文暑假作文写事作文写物作文节日作文话题作文描写作文记述文应用文毕业作文散文随笔日记游记写作指导 |
Dong Lu
Rm 549, Office Tower 2, Xingye Center
No.18, Jian Guo Men Nei Ave. Phone: 13910212358
Beijing China (100005) Email: liudong@263.net
--------------------------------------------------------------------------------------------------------
WORK EXPERIENCE
XXXXInc., Beijing, China 2001/3 to Present
(Headquarters in Houston, Texas, U.S.A.)
XXX Service Engineer
Sole representative of company's XXXDivision in China. Provide consulting and customer service. Manage technical service for MSX, Digicouse and Sleeve Gun.
Key Achievements in 2001/6
Analyzed cause of MSX system's breakdown on vessel Mv501 Orient Pearl. Sent results to I/O's headquarters, which proved critical for solving the equipment problem.
Worked independently on new cables inspection at GMGS (Guangzhou Marine Geophysical Survey Bureau) and on offshore experiments.
Worked on installation, testing and offshore inspection of Digipoint's acoustic navigation system in shallow water.
Provided consulting and directed installation, testing and inspection of GMGS's LOG Recording System (MSX), equipment worth $1 million, purchased from I/O.
Feida Geophysical Company, Tianjin, China 2000/1 - 2001/2
(BGP and COGC joint enterprise)
Chief Engineer
In charge of equipment acquisition and quality control of seismic recording. Assumed key responsibility for inspection of I/O MSX Record System ($11.7 million seismic recording system; the largest in number of channels and cables in China).
China Oilfield Geophysical Corporation, Dalian , China 1983 - 1999
Senior Engineer
Responsible for maintenance, field service and product development.
Maintained and repaired many types of recording and navigating systems, including DIGISEIS-200, TELESEIS-RTDT, MYRIASEIS (telemetric digital recording system), SYNTRON-480, TITAN-1000 (OBC and marine seismic instrument), 542/217C & 542/217E (microwave navigation systems), ARGO, SERCEL DGPS (low frequency navigation system), and others.
Key Achievement/Awards
In Jan 1998, solved problem of Hydrophone Location System (HLS) interfering with Syntron-480 recording system on vessel BinHai504 (OBC), operating in Bohai for Kree-Mcgee oil company, whose representatives were unwilling to continue production. After checking recording system and HLS, identified trouble as originating from MACHA timer, and modified timing sequence to fix problem. Gained time and recovered production for COGC.
In 1996, joined project team implementing Real-Time Supervisor System for Tiger-II air gun controller. Responsible for hardware integration. Received Science and Technology Progress Award from COGC.
本新闻共2页,当前在第1页 1 2